Luke Stergiou / Photo Editor

On Monday, April 16, Keene State College students were directed around construction barriers while the Physical Plant crew made repairs to the deteriorating steam piping system. The trench seen above stretched around the Media Art Center and across a portion of Appian Way that is between the MAC and the Spaulding Gym. At the end of the day, the trenches were filled back in.